Change Management and Maintenance Window Tracking

This dataset provides detailed records of planned maintenance and change management activities, including scheduling, affected services, approval workflow, implementation outcomes, and validation steps. It enables organizations to track, audit, and optimize their change processes, ensuring service reliability and compliance. Ideal for IT operations, network management, and risk analysis.

  • last updated 1 Nov 2025
  • by GoMask
The brief that made it

Operational tracking and reporting of IT/network changes

Sample rows

preview · 8 of 350 rows · all 13 columns
change_request_idstringchange_typestringchange_statusstringmaintenance_window_startdatetimemaintenance_window_enddatetimeaffected_servicesstringinitiatorstringapproval_statusstringapproval_datedatetimeimplementation_datedatetimerollback_planstringpost_change_validationstringnotesstring
CR0001software upgradesuccess2024-06-15T01:00:00Z2024-06-15T05:00:00Zapi,web,mobileteam_devopsapproved2024-06-10T12:00:00Z2024-06-15T03:15:00ZRestore previous application version from backup.All endpoints tested, latency within SLA, user login validated.Upgrade to v2.3 completed successfully; all regions notified.
CR0156configuration changepending2024-06-22T22:00:00Z2024-06-23T01:00:00Znotifications,cdnalex.smithawaiting approvalblankblankManual revert of config files to previous commit.blankPlanned CDN routing update for redundancy.
CR1102hardware replacementin-progress2024-07-04T03:00:00Z2024-07-04T06:00:00Zrouter,load-balancer,firewallinfra_team_eastapproved2024-07-01T09:00:00ZblankFallback to backup hardware units.blankNetwork hardware refresh for fiscal year start.
CR2002software upgradefailure2024-06-18T02:00:00Z2024-06-18T08:00:00Zdashboard,analyticsproduct_teamapproved2024-06-15T14:00:00Z2024-06-18T06:00:00ZRestore previous dashboard build from image.Post-upgrade validation failed; dashboard not loading.Upgrade to analytics backend failed due to migration issues.
CR0319configuration changesuccess2024-06-16T23:00:00Z2024-06-17T03:00:00Zapi,webconfig_teamapproved2024-06-14T10:00:00Z2024-06-17T01:00:00ZRevert API config to previous settings.API and web authentication verified; error rate normal.Enabled new rate-limiting policy for all users.
CR0411hardware replacementfailure2024-06-30T02:00:00Z2024-06-30T04:00:00Zstorage,backup,cachenetwork_teamapproved2024-06-25T09:30:00Z2024-06-30T03:00:00ZSwitch storage to cloud backup node.Backup unit failed to initialize; cache degraded.Emergency replacement after hardware alert.
CR1214software upgradesuccess2024-06-20T00:00:00Z2024-06-20T05:00:00Zmobile,webqa_teamapproved2024-06-18T11:00:00Z2024-06-20T04:15:00ZRestore previous mobile build.Mobile/web app tested; feature toggles verified.International rollout for new mobile feature.
CR1910configuration changepending2024-06-12T21:00:00Z2024-06-12T23:00:00Zcdn,web,apiemma.brownawaiting approvalblankblankManual revert of CDN config file.blankNew CDN endpoint configuration for APAC region.

What the 350 rows show

from the 350-row sample
change_type350 rows by value
060120117software upg…33%116configuratio…33%117hardware rep…33%
change_status350 rows · 4 values
  1. success121
  2. pending96
  3. in-progress77
  4. failure56
13 columns by typefrom the column list below
  • string 9
  • datetime 4

Columns

13 columns in two groups
blueprint · 13 columns
columntypedescriptionexample
Text 9 columns
change_request_idstringUnique identifier for the change requestuniqueCR0001
change_typestringType of change being performed (e.g., software upgrade, configuration change, hardware replacement)3 valuessoftware upgrade
affected_servicesstringComma-separated list of services impacted by the changeapi,web,mobile
rollback_planstringDescription of the rollback plan in case the change failsoptionalSwitch to backup router.
change_statusstringOutcome status of the change (success, failure, pending, in-progress)success · failure · pending · in-progresssuccess
post_change_validationstringSummary of validation steps and results after the change is implementedoptionalAll endpoints tested, lat…
initiatorstringName or identifier of the person or team who initiated the changeteam_devops
approval_statusstringIndicates if the change has been approved, rejected, or is awaiting approvalapproved · rejected · awaiting approvalapproved
notesstringAdditional notes or comments related to the changeoptionalUpgrade to v2.3 completed…
Dates and times 4 columns
maintenance_window_startdatetimeScheduled start date and time for the maintenance window2024-06-15T01:00:00Z
maintenance_window_enddatetimeScheduled end date and time for the maintenance window2024-06-15T05:00:00Z
approval_datedatetimeDate and time when the change was approvedoptional2024-06-10T12:00:00Z
implementation_datedatetimeActual date and time when the change was implementedoptional2024-06-15T03:15:00Z

Use it for

  • rows35013 columnsrows by change type117softwa…116config…117hardwa…

    A technology dashboard

    A breakdown of change_status. Excel, Power BI or Tableau.

  • What pattern can you find in 350 rows?

    A class exercise

    Hand out the rows and one question. Everyone works from the same 350 rows.

  • A software demo

    Believable change requests with change_type, maintenance_window_start and maintenance_window_end to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 13 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

1,000 rows: $1.99 · 10,000: $12.99One-time. No subscription. All prices

This dataset350 rows13 columns
Yours1,000 rows13 columns

blueprint · change-management-and-maintenance-window-tracking

Behind this dataset

Same schema. As many rows as you need.

These 350 rows came out of a blueprint — 13 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • Change request ID and submitter
  • Change type: software upgrade, configuration change, hardware replacement, capacity addition
  • Priority/risk: emergency, high, medium, low
  • Maintenance window: scheduled start and end time (typically overnight)
  • Affected network elements and services
  • Customer notification: advance notice for planned maintenance
  • Change Advisory Board (CAB) approval for high-risk changes
  • Rollback plan: documented steps to revert if issues occur
Rows
Open the blueprint in Data Factory

1 credit per row. Preview 20 rows free. Buy rows for the full run.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
change-management-and-maintenance-window-tracking

What should your data show?

Preview 20 rows free
No signup. No card.