EV Charger Supply Chain Mapping

This dataset provides a detailed, stage-by-stage mapping of the EV charger supply chain, tracking each component from raw material sourcing through manufacturing, transport, and installation. It includes supplier information, logistics data, environmental impact estimates, and bottleneck identification, enabling operators and analysts to optimize supply chain resilience, sustainability, and efficiency.

  • last updated 30 Jan 2026
  • by GoMask
The brief that made it

Identifying and mitigating supply chain bottlenecks for EV charger deployment

Sample rows

preview · 8 of 120 rows · all 23 columns
supply_stage_idstringsupply_stagestringquantityfloatbottleneck_flagbooleanmaterial_typestringcomponent_idstringcomponent_namestringsupplier_idstringsupplier_namestringsupplier_countrystringsupplier_citystringunitstringstage_start_datedatestage_end_datedatetransport_modestringorigin_countrystringdestination_countrystringdistance_kmfloatlead_time_daysfloatco2e_kgfloatlast_updateddatetimedependency_notesstringenvironmental_impact_notesstring
SSG-00001raw_material15600.5falsecopperCMP-PWR-001Power ModuleSUP-CHN-101Guangzhou Metals LtdChinaGuangzhoukg2023-02-012023-02-08railChinaGermany527072450.22023-02-08T15:54:23ZblankMining activity increases land degradation and water pollution.
SSG-00002manufacturing4100falsemetal alloyCMP-PWR-001Power ModuleSUP-DEU-202Berlin Power FabricationGermanyBerlinunits2023-02-092023-02-16truckblankblank1207320.12023-02-16T17:13:49ZblankProduction processes contribute to air emissions and energy use.
SSG-00003transport3800trueblankCMP-PWR-001Power ModuleSUP-SGP-303Lion Shipping GroupSingaporeSingaporeunits2023-02-172023-02-22shipGermanyUSA69005840.52023-02-22T19:15:12ZPort congestion delayed shipment by 2 days.Heavy fuel oil usage increases marine emissions during transport.
SSG-00004assembly3100falseblankCMP-PWR-001Power ModuleSUP-USA-404Eagle Assembly SolutionsUSACharlotteunits2023-02-232023-03-01blankblankblank0655.32023-03-01T13:17:08ZblankLabor and energy use drive moderate environmental impacts in assembly.
SSG-00005installation1falseblankCMP-PWR-001Power ModuleSUP-UK-505Green Install ServicesUKLondonunit2023-03-022023-03-03blankblankblank010.122023-03-03T08:30:59ZblankMinimal CO2e as installation uses local renewable energy.
SSG-00006raw_material12230falsecopperCMP-CBL-002Charging CableSUP-AUS-111Sydney Copper CoAustraliaSydneykg2022-09-102022-09-17truckAustraliaVietnam320071690.72022-09-17T11:55:43ZblankOpen pit mining causes significant dust and groundwater impact.
SSG-00007manufacturing3200falsePVCCMP-CBL-002Charging CableSUP-VNM-212Da Nang Cable WorksVietnamDa Nangmeters2022-09-182022-09-27blankblankblank09208.92022-09-27T20:05:44ZblankPlastic extrusion creates moderate VOC emissions.
SSG-00008transport2800falseblankCMP-CBL-002Charging CableSUP-BRA-313Rio Logistics GroupBrazilRio de Janeirometers2022-09-282022-10-02railVietnamIndia51004610.32022-10-02T18:19:39ZblankDiesel rail transport increases fine particulate emissions.

What the 120 rows show

from the 120-row sample

Raw_material (supply stage) stands out: mean quantity is 13,992, against 2,062 for the rest.

  • 18%bottleneck_flag = true
  • 2,671median quantity
  • 4units
  • 6transport modes
  • 7component names
  • 10destination countries
Mean quantity by supply_stage120 rows
010k20k13,992raw_ma…24 rows3,179manufa…24 rows2,058assemb…24 rows3,012transp…24 rows1.0instal…24 rows
quantity120 rows, in bands of 2,000
02550384711113676010k18kquantity →

Median 2,671, from 1.0 to 18,000.

material_type48 rows with a value · 72 left blank
  1. metal alloy9
  2. copper7
  3. polypropylene6
  4. aluminum6
  5. PVC5
  6. ABS plastic5
  7. tin5
  8. PCB substrate5
23 columns by typefrom the column list below
  • string 15
  • float 4
  • date 2
  • datetime 1
  • boolean 1

Columns

23 columns in four groups
blueprint · 23 columns
columntypedescriptionexample
Text 15 columns
supply_stage_idstringUnique identifier for the supply chain stage recorduniqueSSG-00001
component_idstringUnique identifier for the EV charger componentCMP-PWR-001
component_namestringName of the EV charger component (e.g., power module, cable, housing)7 namesPower Module
supply_stagestringName of the supply chain stage (e.g., raw_material, manufacturing, assembly, transport, installation)5 valuesraw_material
supplier_idstringUnique identifier for the supplier at this stageSUP-CHN-101
supplier_namestringName of the supplier or manufacturerGuangzhou Metals Ltd
supplier_countrystringCountry where the supplier is locatedChina
supplier_citystringCity where the supplier is locatedoptionalGuangzhou
material_typestringType of raw material or subcomponent used at this stage (e.g., copper, aluminum, plastic)8 types · optionalcopper
unitstringUnit of measurement for the quantity (e.g., kg, units, meters)4 units · optionalkg
transport_modestringMode of transport used between supply stages (e.g., truck, ship, rail, air)6 values · optionalrail
origin_countrystringCountry where the supply stage originated11 countries · optionalChina
destination_countrystringCountry where the supply stage is delivered or processed10 countries · optionalGermany
dependency_notesstringNotes on supplier dependencies or critical risks at this stageoptionalPort congestion delayed s…
environmental_impact_notesstringAdditional notes on environmental impact or sustainability concernsoptionalMining activity increases…
Numbers 4 columns
quantityfloatQuantity of material/component handled at this stage (in standard units)0 or more · optional15600.5
distance_kmfloatDistance traveled during this supply stage in kilometers0 or more · optional5270
lead_time_daysfloatLead time for this supply stage in days0 or more · optional7
co2e_kgfloatEstimated CO2 equivalent emissions (in kg) for this supply stage0 or more · optional2450.2
Dates and times 3 columns
stage_start_datedateDate when this supply stage startedoptional2023-02-01
stage_end_datedateDate when this supply stage endedoptional2023-02-08
last_updateddatetimeTimestamp when this record was last updated2023-02-08T15:54:23Z
True or false 1 column
bottleneck_flagbooleanIndicates if this stage is a known supply chain bottleneckoptionalfalse

Use it for

  • bottleneck flag18%21 of 120 rowsmean quantity by supp…14kraw_…3.2kmanu…2.1kasse…3ktran…

    A logistics dashboard

    The bottleneck_flag rate, quantity by supply_stage and a breakdown of material_type. Excel, Power BI or Tableau.

  • Why do the 24 raw_material rows have a mean quantity of 13,992?

    A root-cause class exercise

    Hand out the rows and one question. The answer is in the data, not in the brief.

  • A software demo

    Believable supply stages with component_id, component_name and supply_stage to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 23 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

10,000 rows of yours: $12.99One-time. No subscription. All prices

This dataset120 rows23 columns
Yours10,000 rows23 columnssupplier_country: UK only

blueprint · ev-charger-supply-chain-mapping

Behind this dataset

Same schema. As many rows as you need.

These 120 rows came out of a blueprint — 23 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • Each supply chain entry includes component type, supplier, and origin.
  • Installation status updated only after confirmed delivery.
  • Transportation method and associated emissions estimated for each leg.
  • Sourcing region flagged if supply risk is identified.
  • Component delays annotated with reason (e.g., shortage, logistics).
Rows
Open the blueprint in Data Factory

1 credit per row. New accounts start with 25 free credits.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
ev-charger-supply-chain-mapping

What should your data show?

Preview 20 rows free
No signup. No card.