This dataset provides detailed tracking of sustainable building material shipments across construction projects, including supplier, material, ESG certification, logistics, and carbon emissions data. It enables real estate and procurement managers to monitor supply chain efficiency, benchmark ESG compliance, and identify bottlenecks in green material sourcing for improved sustainability reporting and operational optimization.
Sample rows
preview · 8 of 150 rows · all 34 columns| shipment_idstring | transport_modestring | distance_kmfloat | is_sustainableboolean | project_address_citystring | project_idstring | project_namestring | project_managerstring | project_address_streetstring | project_address_statestring | project_address_postal_codestring | project_address_countrystring | material_idstring | material_namestring | material_categorystring | esg_certificationstring | supplier_idstring | supplier_namestring | supplier_address_streetstring | supplier_address_citystring | supplier_address_statestring | supplier_address_postal_codestring | supplier_address_countrystring | shipment_datedate | expected_delivery_datedate | actual_delivery_datedate | shipment_statusstring | quantityfloat | unit_of_measurestring | estimated_co2e_kgfloat | esg_compliance_flagboolean | bottleneck_flagboolean | bottleneck_reasonstring | notesstring |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SHIP-00001 | truck | 33.5 | false | Denver | PRJ-1001 | Sunset Lofts | Jessica Morales | 1421 Oak Lane | CO | 80203 | USA | MAT-0011 | Reinforced Concrete | concrete | blank | SUP-102 | Rocky Mountain Supply Co. | 3015 Quarry Blvd | Aurora | CO | 80014 | USA | 2024-03-04 | 2024-03-08 | 2024-03-08 | delivered | 35.2 | tons | 207.9 | false | false | blank | Delivered as scheduled, no issues reported. |
| SHIP-00002 | truck | 72.4 | false | San Jose | PRJ-1002 | Green Valley Tech Hub | Samuel Chen | 1842 Innovation Dr | CA | 95125 | USA | MAT-0023 | Recycled Steel Beams | steel | blank | SUP-104 | Pacific Steel LLC | 4398 Foundry Way | Fremont | CA | 94538 | USA | 2024-03-08 | 2024-03-12 | 2024-03-12 | delivered | 20.5 | tons | 449.68 | false | false | blank | Steel shipment received in good condition. |
| SHIP-00003 | rail | 326.9 | true | Seattle | PRJ-1003 | Cascade Heights Condos | Linda Foster | 5907 Summit Ave | WA | 98105 | USA | MAT-0034 | Timber Panels FSC | timber | FSC | SUP-106 | Evergreen Lumber | 1220 Pine St | Tacoma | WA | 98402 | USA | 2024-03-10 | 2024-03-15 | 2024-03-17 | delayed | 700 | pieces | 367.76 | true | true | Rail strike caused two-day delay. | Delayed due to labor action; notified project team. |
| SHIP-00004 | ship | 3120.5 | true | San Francisco | PRJ-1004 | Bayview Business Center | Michael Kim | 437 Bay St | CA | 94107 | USA | MAT-0042 | Facade Glass Panels | facade | LEED | SUP-108 | Crystal Facades Inc. | 892 Market Ave | Oakland | CA | 94607 | USA | 2024-03-12 | 2024-03-25 | 2024-03-28 | delayed | 170 | pieces | 1248.2 | true | true | Shipping container backlog at port. | Delay at Oakland port; expedited unloading requested. |
| SHIP-00005 | truck | 354.7 | true | Dallas | PRJ-1005 | Metro Apartments | David Patel | 9814 6th St | TX | 75204 | USA | MAT-0053 | Insulation Foam Boards | insulation | LEED | SUP-110 | Sunrise Building Materials | 4021 Commerce Rd | Houston | TX | 77002 | USA | 2024-03-14 | 2024-03-17 | 2024-03-17 | delivered | 600 | pieces | 638.46 | true | false | blank | Delivered as planned; sustainability documentation verified. |
| SHIP-00006 | rail | 1985.2 | true | Seattle | PRJ-1006 | Rainier Plaza | Olivia Thompson | 415 47th Ave E | WA | 98116 | USA | MAT-0064 | Electrical Wiring Sets | electrical | Cradle to Cradle | SUP-112 | Northwest Electric | 7011 Wire St | Redmond | WA | 98052 | USA | 2024-03-18 | 2024-03-23 | 2024-03-24 | delayed | 110 | meters | 413.53 | true | true | Customs inspection at border. | Delay due to customs check; project notified. |
| SHIP-00007 | truck | 83.6 | false | Austin | PRJ-1007 | TechLink Offices | Ava Lee | 9230 Northgate Blvd | TX | 78758 | USA | MAT-0071 | Galvanized Steel Rods | steel | blank | SUP-113 | Lone Star Metals | 222 Foundry Dr | El Paso | TX | 79901 | USA | 2024-03-20 | 2024-03-25 | 2024-03-25 | delivered | 42.8 | tons | 502.67 | false | false | blank | Steel rods delivered on time. |
| SHIP-00008 | rail | 485.4 | true | Portland | PRJ-1008 | Cedar Ridge Townhomes | Ethan Walker | 771 Cedar Crest Dr | OR | 97201 | USA | MAT-0085 | Sustainable Timber Boards | timber | FSC | SUP-115 | Pine Valley Lumber Co. | 3578 Timber Ave | Eugene | OR | 97401 | USA | 2024-03-21 | 2024-03-26 | 2024-03-26 | delivered | 870 | pieces | 545.17 | true | false | blank | High-volume timber shipment; FSC certificate on file. |
| SHIP-00009 | ship | 3880.7 | true | San Diego | PRJ-1009 | Silver Gate Residences | Isabella Martinez | 1204 Gateway Rd | CA | 92108 | USA | MAT-0092 | Facade Cladding Panels | facade | LEED | SUP-116 | West Coast Cladding | 6012 Industrial Pkwy | Los Angeles | CA | 90021 | USA | 2024-03-23 | 2024-04-02 | 2024-04-04 | delayed | 260 | pieces | 1552.28 | true | true | Severe storm delayed vessel arrival. | Weather impacted delivery; insurance claim initiated. |
| SHIP-00010 | truck | 289.5 | true | Houston | PRJ-1010 | Urban Edge Offices | Liam Adams | 2454 Market St | TX | 77003 | USA | MAT-0101 | Insulation Batts LEED | insulation | LEED | SUP-118 | Lone Star Insulation | 1303 Thermal Rd | Dallas | TX | 75207 | USA | 2024-03-25 | 2024-03-29 | 2024-03-29 | delivered | 550 | pieces | 521.1 | true | false | blank | Insulation delivered; LEED paperwork submitted. |
| SHIP-00011 | rail | 426.2 | true | Sacramento | PRJ-1011 | Sierra Park Homes | Noah Green | 1653 Maple Rd | CA | 95818 | USA | MAT-0115 | Timber Framing Sets | timber | FSC | SUP-119 | California Timberworks | 725 Forest Ave | Chico | CA | 95926 | USA | 2024-03-27 | 2024-04-01 | 2024-04-01 | delivered | 950 | pieces | 618.57 | true | false | blank | Large timber order, completed on schedule. |
| SHIP-00012 | ship | 3180.6 | true | New York | PRJ-1012 | Harbor Point Tower | Emma White | 221 Harbor St | NY | 10011 | USA | MAT-0127 | Facade Aluminum Panels | facade | LEED | SUP-120 | Metro Facades | 888 Riverside Dr | New York | NY | 10032 | USA | 2024-03-29 | 2024-04-10 | 2024-04-12 | delayed | 210 | pieces | 1272.24 | true | true | Dock workers strike delayed unloading. | Labor strike affected delivery; project extended deadline. |
| SHIP-00013 | truck | 59.1 | false | San Jose | PRJ-1013 | Pinecrest Offices | Mason Carter | 4712 Pinecrest Dr | CA | 95132 | USA | MAT-0134 | Steel Reinforcement Rods | steel | blank | SUP-122 | Bay Area Steel | 7120 Ironworks Dr | Fremont | CA | 94536 | USA | 2024-04-02 | 2024-04-08 | 2024-04-08 | delivered | 28.9 | tons | 354.6 | false | false | blank | Steel rods arrived; quality inspection passed. |
| SHIP-00014 | rail | 1630.2 | true | Portland | PRJ-1014 | Riverfront Apartments | Sophia Clark | 183 River St | OR | 97209 | USA | MAT-0148 | Facade Curtain Walls | facade | Cradle to Cradle | SUP-124 | EcoGlass Solutions | 1500 Glassworks Ave | Portland | OR | 97214 | USA | 2024-04-04 | 2024-04-16 | 2024-04-16 | delivered | 85 | pieces | 365.37 | true | false | blank | Curtain wall shipment completed; installation started. |
| SHIP-00015 | truck | 92.2 | false | Denver | PRJ-1015 | Liberty Plaza | blank | 603 Liberty Ave | CO | 80211 | USA | MAT-0152 | Ready-Mix Concrete | concrete | blank | SUP-125 | Mile High Concrete | blank | Aurora | CO | 80012 | USA | 2024-04-06 | 2024-04-10 | 2024-04-10 | delivered | 49.5 | cubic meters | 553.2 | false | false | blank | Concrete pour complete; supplier address missing in system. |
| SHIP-00016 | ship | 2780 | true | San Francisco | PRJ-1016 | Oceanview Resort | Benjamin Evans | 124 Ocean Blvd | CA | 94133 | USA | MAT-0164 | Facade Glass Sheets | facade | LEED | SUP-127 | Global Facade Ltd | 701 Pier St | San Francisco | CA | 94158 | USA | 2024-04-08 | 2024-04-20 | blank | in_transit | 62 | pieces | 1112.8 | true | false | blank | Shipment in progress; tracking updated daily. |
| SHIP-00017 | truck | 24.7 | false | San Francisco | PRJ-1017 | Pacific Heights Tower | Lucas Wright | 800 Pacific Ave | CA | 94109 | USA | MAT-0175 | Concrete Floor Slabs | concrete | blank | SUP-130 | Bay Concrete Group | 2000 Mission Blvd | San Francisco | CA | 94110 | USA | 2024-04-10 | 2024-04-16 | blank | in_transit | 23.3 | tons | 153.02 | false | false | blank | Concrete slabs en route; ETA confirmed. |
| SHIP-00018 | air | 65.3 | true | New York | PRJ-1018 | Skyline Residences | Mia Robinson | 5620 Skyline Dr | NY | 10022 | USA | MAT-0182 | Electrical Cable Sets | electrical | Cradle to Cradle | SUP-131 | Empire Electric | 420 Madison Ave | New York | NY | 10017 | USA | 2024-04-11 | 2024-04-14 | 2024-04-16 | delayed | 75 | meters | 97.95 | true | true | Emergency rerouting required by airline. | Urgent rerouting due to flight cancellation. |
| SHIP-00019 | truck | 221.6 | true | Olympia | PRJ-1019 | Olympia Center | Harper Young | 501 Main St | WA | 98501 | USA | MAT-0196 | Insulation Rolls | insulation | LEED | SUP-132 | Puget Insulation | 1111 Roll Ave | Tacoma | WA | 98421 | USA | 2024-04-13 | 2024-04-17 | 2024-04-17 | delivered | 420 | pieces | 397.32 | true | false | blank | Insulation rolls delivered; project on schedule. |
| SHIP-00020 | truck | 56.9 | false | San Jose | PRJ-1002 | Green Valley Tech Hub | Samuel Chen | 1842 Innovation Dr | CA | 95125 | USA | MAT-0203 | Galvanized Steel Sheets | steel | blank | SUP-104 | Pacific Steel LLC | 4398 Foundry Way | Fremont | CA | 94538 | USA | 2024-04-15 | 2024-04-18 | 2024-04-18 | delivered | 31.7 | tons | 341.4 | false | false | blank | Steel sheets delivered; inventory restocked. |
What the 150 rows show
from the 150-row sampleShip (transport mode) stands out: mean distance_
- 55%is_
sustainable = true - 103.2median distance_
km - 3esg certifications
- 4unit of measures
- 5shipment statuses
- 6material categories
Median 103.2, from 0.0 to 4,212.
- string 25
- float 3
- date 3
- boolean 3
Columns
34 columns in four groups| column | type | description | example |
|---|---|---|---|
| Text 25 columns | |||
shipment_id | string | Unique identifier for each material shipmentunique | SHIP-00001 |
project_id | string | Unique identifier for the construction project receiving the shipment | PRJ-1001 |
project_name | string | Name of the construction project | Sunset Lofts |
project_manager | string | Name of the project manager overseeing the construction projectoptional | Jessica Morales |
project_address_street | string | Street address of the construction project site | 1421 Oak Lane |
project_address_city | string | City of the construction project site | Denver |
project_address_state | string | State or province of the construction project site9 states | CO |
project_address_postal_code | string | Postal or ZIP code of the construction project site | 80203 |
project_address_country | string | Country of the construction project site | USA |
material_id | string | Unique identifier for the building material | MAT-0011 |
material_name | string | Name or description of the building material | Reinforced Concrete |
material_category | string | Category of the building material (e.g., insulation, concrete, timber, steel)6 categories | concrete |
esg_certification | string | Name of the ESG or green certification (e.g., LEED, FSC, Cradle to Cradle)3 certifications · optional | FSC |
supplier_id | string | Unique identifier for the material supplier | SUP-102 |
supplier_name | string | Name of the supplier providing the material | Pacific Steel LLC |
supplier_address_street | string | Street address of the supplieroptional | 3015 Quarry Blvd |
supplier_address_city | string | City of the supplieroptional | Aurora |
supplier_address_state | string | State or province of the supplier8 states · optional | CO |
supplier_address_postal_code | string | Postal or ZIP code of the supplieroptional | 80014 |
supplier_address_country | string | Country of the supplieroptional | USA |
shipment_status | string | Current status of the shipmentpending · in_transit · delivered · delayed · cancelled | delivered |
unit_of_measure | string | Unit of measure for the material quantity (e.g., tons, cubic meters, pieces)4 measures | tons |
transport_mode | string | Mode of transport used for the shipment (e.g., truck, rail, ship, air)4 modes | truck |
bottleneck_reason | string | Description of the reason for the bottleneck, if anyoptional | Rail strike caused two-da… |
notes | string | Additional notes or comments about the shipmentoptional | Delivered as scheduled, n… |
| Numbers 3 columns | |||
quantity | float | Quantity of material shipped (in specified units)0 or more | 35.2 |
distance_km | float | Distance covered by the shipment in kilometers0 or more | 33.5 |
estimated_co2e_kg | float | Estimated CO2 equivalent emissions (in kilograms) for the shipment0 or more | 207.9 |
| Dates and times 3 columns | |||
shipment_date | date | Date when the shipment was dispatched | 2024-03-04 |
expected_delivery_date | date | Expected date of delivery to the project site | 2024-03-08 |
actual_delivery_date | date | Actual date when the shipment was deliveredoptional | 2024-03-08 |
| True or false 3 columns | |||
is_sustainable | boolean | Indicates if the material is certified as sustainable | false |
esg_compliance_flag | boolean | Indicates if the shipment meets ESG compliance requirements | false |
bottleneck_flag | boolean | Indicates if this shipment experienced a supply chain bottleneck | false |
Use it for
A logistics dashboard
The is_
sustainable rate, distance_ km by transport_ mode and a breakdown of project_ address_ city. Excel, Power BI or Tableau. Why do the 28 ship rows have a mean distance_
km of 2,628? A root-cause class exercise
Hand out the rows and one question. The answer is in the data, not in the brief.
- Shipments150SHIP-0000133.5truckSHIP-00003326.9railSHIP-000043120.5ship
A software demo
Believable shipments with project_
id, project_ name and project_ manager to fill a screen in front of a buyer.
blueprint · green-building-material-supply-tracker
Behind this dataset
Same schema. As many rows as you need.
These 150 rows came out of a blueprint — 34 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.
- Each row represents a unique material shipment event.
- Include supplier, material type, certification status, estimated carbon footprint.
- Shipments flagged if delivery exceeds project deadlines.
- Materials lacking recognized green certification must be highlighted.
- Record source location and distance-to-site for footprint calculation.
- Shipments with high carbon impact are automatically prioritized for review.
1 credit per row. New accounts start with 25 free credits.
- Exports
- CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
- Licence
- yours to use, including commercially
- API slug
- green-building-material-supply-tracker