Manufacturing Material Consumption Data
This dataset provides granular, transaction-level records of material consumption across manufacturing plants, including details on material types, quantities, costs, waste, and process context. It enables manufacturers to analyze usage trends, optimize procurement, reduce waste, and improve production efficiency through actionable insights.
Sample rows
preview · 8 of 200 rows · all 21 columns| record_idstring | waste_reasonstring | waste_generatedfloat | plant_idstring | plant_namestring | material_idstring | material_namestring | material_typestring | batch_numberstring | process_idstring | process_namestring | consumption_datedate | quantity_consumedfloat | unit_of_measurestring | operator_idstring | operator_namestring | shiftstring | supplier_idstring | supplier_namestring | cost_per_unitfloat | total_costfloat |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MC-00001 | overproduction | 1500.85 | PL-101 | Metro South | MT-10001 | Iron Ore | raw | BN-15001 | PR-20001 | Foundry | 2024-06-03 | 74500.5 | kg | OP-350 | Samuel Torres | morning | SUP-10051 | North Metals | 2.45 | 182627.225 |
| MC-00002 | blank | 0 | PL-102 | Evergreen South | MT-10002 | Copper Sheet | semi-finished | BN-15002 | PR-20002 | Extrusion | 2024-06-04 | 2250.75 | kg | OP-351 | Linda Park | evening | SUP-10052 | CopperWorks Inc. | 5.95 | 13405.9625 |
| MC-00003 | defect | 0.01 | PL-103 | Highland Works | MT-10003 | Aluminum Ingot | raw | blank | PR-20003 | Cutting | 2024-06-05 | 62.5 | kg | OP-352 | Carlos Reyes | night | SUP-10053 | Alumax | 82.55 | 5159.375 |
| MC-00004 | blank | 0 | PL-104 | Mountain Peak | MT-10004 | Steel Bar | semi-finished | BN-15003 | PR-20004 | Tempering | 2024-06-06 | 45 | kg | OP-353 | Anna Li | morning | SUP-10054 | SteelOne | 120 | 5400 |
| MC-00005 | spillage | 50 | PL-105 | Metro Central | MT-10005 | Plastic Housing | finished | BN-15004 | PR-20005 | Packaging | 2024-06-07 | 1200 | pieces | OP-354 | Ahmed Patel | night | SUP-10055 | Plastix | 0.85 | 1020 |
| MC-00006 | defect | 3 | PL-106 | Eastern Shore | MT-10006 | Circuit Board | finished | BN-15005 | PR-20006 | Inspection | 2024-06-08 | 150 | pieces | OP-355 | Jamie Chen | evening | SUP-10056 | CircuTech | 4.25 | 637.5 |
| MC-00007 | blank | 0 | PL-107 | Harbor East | MT-10007 | Epoxy Resin | semi-finished | blank | PR-20007 | Painting | 2024-06-09 | 1850.25 | liters | OP-356 | Emily Davis | morning | SUP-10057 | ResinPro | 9.8 | 18132.45 |
| MC-00008 | overproduction | 2575.6 | PL-108 | Greenfield | MT-10008 | Scrap Iron | raw | blank | PR-20008 | Recycling | 2024-06-10 | 2575.6 | kg | blank | blank | evening | blank | blank | 0.03 | 77.268 |
| MC-00009 | spillage | 1200 | PL-101 | Metro South | MT-10009 | Granulated Sand | raw | BN-15006 | PR-20009 | Mixing | 2024-06-11 | 100000 | kg | OP-357 | Sarah White | morning | SUP-10058 | SandCo | 1.15 | 115000 |
| MC-00010 | defect | 0.08 | PL-102 | Evergreen South | MT-10010 | Polymer Blend | semi-finished | BN-15007 | PR-20010 | Polishing | 2024-06-12 | 35.6 | kg | OP-358 | Michael Johnson | night | SUP-10059 | PolyBlend Inc. | 55.5 | 1975.8 |
| MC-00011 | blank | 0 | PL-103 | Highland Works | MT-10011 | Chrome Plate | semi-finished | BN-15008 | PR-20011 | Etching | 2024-06-13 | 0.01 | kg | OP-359 | Olga Ivanov | morning | SUP-10060 | ChromeWorks | 460 | 4.6 |
| MC-00012 | defect | 30 | PL-104 | Mountain Peak | MT-10012 | Plastic Case | finished | BN-15009 | PR-20012 | Packaging | 2024-06-14 | 600 | pieces | OP-360 | Harriet King | evening | SUP-10061 | PlasticTech | 0.65 | 390 |
| MC-00013 | defect | 10 | PL-105 | Metro Central | MT-10013 | Finished Motor | finished | BN-15010 | PR-20013 | Shipping Prep | 2024-06-15 | 450 | pieces | OP-361 | Peter Brown | night | SUP-10062 | MotorWorks | 8.2 | 3690 |
| MC-00014 | blank | 0 | PL-106 | Eastern Shore | MT-10014 | Wire Harness | semi-finished | BN-15011 | PR-20014 | Assembly | 2024-06-16 | 1300 | kg | OP-362 | Susan Young | morning | SUP-10063 | WireTech | 3.85 | 5005 |
| MC-00015 | blank | 0 | PL-107 | Harbor East | MT-10015 | Epoxy Coating | semi-finished | blank | PR-20015 | Painting | 2024-06-17 | 1950.85 | liters | OP-363 | Anna Wills | evening | SUP-10064 | EpoxyPro | 8.9 | 17362.565 |
| MC-00016 | overproduction | 2025.25 | PL-108 | Greenfield | MT-10016 | Scrap Copper | raw | blank | PR-20016 | Recycling | 2024-06-18 | 2025.25 | kg | blank | blank | evening | blank | blank | 0.05 | 101.2625 |
| MC-00017 | defect | 550 | PL-101 | Metro South | MT-10017 | Raw Tungsten | raw | BN-15012 | PR-20017 | Foundry | 2024-06-19 | 54000 | kg | OP-364 | John Miller | morning | SUP-10065 | Tungsten Inc. | 3.8 | 205200 |
| MC-00018 | defect | 0.02 | PL-102 | Evergreen South | MT-10018 | Copper Rod | semi-finished | BN-15013 | PR-20018 | Assembly | 2024-06-20 | 750 | kg | OP-365 | Martha Lopez | evening | SUP-10066 | CopperWorks Inc. | 6.9 | 5175 |
| MC-00019 | blank | 0 | PL-103 | Highland Works | MT-10019 | Nickel Sheet | raw | blank | PR-20019 | Cutting | 2024-06-21 | 0.001 | kg | OP-366 | Victor Chang | night | SUP-10067 | NickelSource | 875 | 0.875 |
| MC-00020 | defect | 2 | PL-104 | Mountain Peak | MT-10020 | Plastic Panel | finished | BN-15014 | PR-20020 | Inspection | 2024-06-22 | 80 | pieces | OP-367 | Megan Smith | morning | SUP-10068 | PlasticTech | 2.15 | 172 |
What the 200 rows show
from the 200-row sampleOverproduction (waste reason) stands out: mean waste_
- 0.02median waste_
generated - 3material types
- 3unit of measures
- 3shifts
- 9plant names
- 14process names
Median 0.02, from 0.0 to 2,996.
- string 16
- float 4
- date 1
Columns
21 columns in three groups| column | type | description | example |
|---|---|---|---|
| Text 16 columns | |||
record_id | string | Unique identifier for each material consumption recordunique | MC-00001 |
plant_id | string | Unique identifier for the manufacturing plant | PL-101 |
plant_name | string | Name of the manufacturing plant9 names | Metro South |
material_id | string | Unique identifier for the material | MT-10001 |
material_name | string | Descriptive name of the material | Iron Ore |
material_type | string | Type or category of the material (e.g., raw, semi-finished, finished)raw · semi-finished · finished | raw |
batch_number | string | Batch or lot number for traceabilityoptional | BN-15001 |
process_id | string | Unique identifier for the production process | PR-20001 |
process_name | string | Name or description of the production process | Foundry |
unit_of_measure | string | Unit of measure for the quantity consumed (e.g., kg, liters, pieces)3 measures | kg |
waste_reason | string | Reason for material waste (e.g., defect, spillage, overproduction)3 reasons · optional | overproduction |
operator_id | string | Identifier for the operator responsible for the processoptional | OP-350 |
operator_name | string | Name of the operator responsible for the processoptional | Samuel Torres |
shift | string | Production shift during which the material was consumed (e.g., morning, evening, night)morning · evening · night · optional | morning |
supplier_id | string | Unique identifier for the material supplieroptional | SUP-10051 |
supplier_name | string | Name of the material supplieroptional | North Metals |
| Numbers 4 columns | |||
quantity_consumed | float | Amount of material consumed (in specified units)0 or more | 74500.5 |
waste_generated | float | Amount of material wasted during the process (in specified units)0 or more · optional | 1500.85 |
cost_per_unit | float | Cost per unit of the material at the time of consumption0 or more · optional | 2.45 |
total_cost | float | Total cost of the material consumed (quantity_consumed * cost_per_unit)0 or more · optional | 182627.225 |
| Dates and times 1 column | |||
consumption_date | date | Date when the material was consumed in production | 2024-06-03 |
Use it for
A manufacturing dashboard
Waste_
generated by waste_ reason and a breakdown of plant_ id. Excel, Power BI or Tableau. Why do the 35 overproduction rows have a mean waste_
generated of 2,034? A root-cause class exercise
Hand out the rows and one question. The answer is in the data, not in the brief.
- Records200MC-000011500.85overprod…MC-000020—MC-000030.01defect
A software demo
Believable records with plant_
id, plant_ name and material_ id to fill a screen in front of a buyer.
blueprint · manufacturing-material-consumption-data
Behind this dataset
Same schema. As many rows as you need.
These 200 rows came out of a blueprint — 21 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.
- Material types and usage logged
- Batch and production line tracked
- Waste and scrap annotated
- Reorder point flags included
1 credit per row. New accounts start with 25 free credits.
- Exports
- CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
- Licence
- yours to use, including commercially
- API slug
- manufacturing-material-consumption-data