Manufacturing Supplier Lead Time Data
This dataset provides detailed records of manufacturing supplier lead times, including order and delivery dates, supplier and material information, and order status. It enables comprehensive analysis of supply chain efficiency, supplier reliability, and procurement optimization for manufacturing operations.
Sample rows
preview · 8 of 200 rows · all 16 columns| supplier_idstring | order_statusstring | lead_time_daysfloat | unit_of_measurestring | supplier_namestring | material_idstring | material_namestring | order_idstring | order_datedate | expected_delivery_datedate | actual_delivery_datedate | quantity_orderedfloat | delay_reasonstring | supplier_countrystring | supplier_citystring | contact_emailstring |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SUPP_A001 | delivered | 6 | kg | Global Steel Components | MAT-STEEL01 | Hot Rolled Steel Sheet | ORD00001 | 2023-02-16 | 2023-02-22 | 2023-02-22 | 2500 | blank | Germany | Dusseldorf | info@ |
| SUPP_B002 | delayed | 7 | units | Pacific Electronics Supply | PLS-ROBOT05 | Robotics Controller Unit | ORD00002 | 2024-01-12 | 2024-01-17 | 2024-01-19 | 1650 | Supplier backorder due to high demand | Japan | Osaka | sales@ |
| SUPP_C003 | delivered | 9 | liters | TransChem Solutions | MTR-CHEM12 | Industrial Cleaning Solvent | ORD00003 | 2023-09-02 | 2023-09-11 | 2023-09-11 | 500 | blank | France | Lyon | info@ |
| SUPP_D004 | delayed | 15 | boxes | Midwest Bearings LLC | MAT-BEAR03 | Precision Ball Bearings - Large | ORD00004 | 2022-10-13 | 2022-10-20 | 2022-10-28 | 12000 | Customs clearance delay | USA | Cleveland | info@ |
| SUPP_E005 | pending | blank | meters | Nordic Fiber Tech | MTR-FIBER07 | Carbon Fiber Spool | ORD00005 | 2024-03-02 | 2024-03-10 | blank | 9500 | blank | Sweden | Stockholm | sales@ |
| SUPP_F006 | delivered | 8 | pcs | Bright Optics Ltd. | PLS-LENS09 | Optical Glass Lenses | ORD00006 | 2023-07-17 | 2023-07-25 | 2023-07-25 | 6000 | blank | United Kingdom | Cambridge | info@ |
| SUPP_G007 | pending | blank | pcs | East Asia Plastics | MAT-TUBE02 | Polymer Tubing 1m | ORD00007 | 2024-05-10 | 2024-05-19 | blank | 50000 | blank | China | Shenzhen | sales@ |
| SUPP_H008 | delayed | 13 | kg | Alpine Metals | MAT-ALUM04 | Aluminum Ingots | ORD00008 | 2023-12-04 | 2023-12-13 | 2023-12-17 | 15000 | Weather-related transport delay | Switzerland | Zurich | info@ |
| SUPP_I009 | delivered | 9 | units | Baltic Robotics | PLS-ROBOT07 | Industrial Servo Motor | ORD00009 | 2022-05-27 | 2022-06-04 | 2022-06-05 | 3000 | blank | Estonia | Tallinn | contact@ |
| SUPP_J010 | delayed | 16 | kg | South American Minerals | MAT-SAND22 | High Purity Quartz Sand | ORD00010 | 2023-04-14 | 2023-04-22 | 2023-04-30 | 8000 | Port closure due to strike | Brazil | Santos | info@ |
| SUPP_K011 | delivered | 7 | boxes | EuroPack Solutions | MTR-PACK33 | Corrugated Packaging Boxes | ORD00011 | 2023-06-05 | 2023-06-12 | 2023-06-12 | 7500 | blank | Italy | Milan | sales@ |
| SUPP_L012 | pending | blank | meters | Aussie Woodworks Pty | MTR-WOOD15 | Hardwood Timber Planks | ORD00012 | 2023-08-18 | 2023-08-28 | blank | 1200 | blank | Australia | Melbourne | info@ |
| SUPP_M013 | delayed | 21 | liters | Himalayan Chemicals | MTR-CHEM09 | Industrial Acetic Acid | ORD00013 | 2022-11-22 | 2022-12-02 | 2022-12-13 | 2500 | Supply chain disruption | India | Mumbai | sales@ |
| SUPP_N014 | pending | blank | units | West Coast Batteries | PLS-BATT03 | Lithium Ion Battery Pack | ORD00014 | 2023-05-03 | 2023-05-10 | blank | 5700 | blank | USA | San Diego | info@ |
| SUPP_O015 | delivered | 6 | units | NordStream Electronics | PLS-ELEC11 | Circuit Board Assembly | ORD00015 | 2023-03-15 | 2023-03-21 | 2023-03-21 | 3200 | blank | Finland | Helsinki | sales@ |
| SUPP_P016 | delayed | 12 | kg | South African Metals | MAT-STEEL22 | High Carbon Steel Rods | ORD00016 | 2023-01-09 | 2023-01-17 | 2023-01-21 | 9800 | Flooding at supplier facility | South Africa | Johannesburg | info@ |
| SUPP_Q017 | pending | blank | boxes | Canadian Packaging Inc. | MTR-PACK19 | Plastic Packaging Boxes | ORD00017 | 2024-04-22 | 2024-05-02 | blank | 1300 | blank | Canada | Toronto | sales@ |
| SUPP_R018 | delivered | 9 | meters | Eastern Wireworks | MAT-WIRE08 | Copper Wire Spool | ORD00018 | 2023-09-29 | 2023-10-06 | 2023-10-08 | 4500 | blank | Poland | Wroclaw | info@ |
| SUPP_S019 | delayed | 10 | units | Southern Robotics Ltd. | PLS-ROBOT18 | Automated Conveyor System | ORD00019 | 2022-07-03 | 2022-07-10 | 2022-07-13 | 3000 | Component shortage | Singapore | Singapore | sales@ |
| SUPP_T020 | delivered | 5 | pcs | MediPlast Syringes | PLS-SYRNG01 | Disposable Medical Syringe | ORD00020 | 2023-02-28 | 2023-03-05 | 2023-03-05 | 22000 | blank | USA | Houston | info@ |
What the 200 rows show
from the 200-row sampleDelivered (order status) stands out: mean lead_
- 9median lead_
time_ days - 50supplier countries
- 3,275median quantity_
ordered
Median 9, from 5 to 30.
- string 11
- float 2
- date 3
Columns
16 columns in three groups| column | type | description | example |
|---|---|---|---|
| Text 11 columns | |||
supplier_id | string | Unique identifier for the supplier providing manufacturing materials or components. | SUPP_A001 |
supplier_name | string | Official name of the supplier. | Global Steel Components |
material_id | string | Unique identifier for the material or component supplied. | MAT-STEEL01 |
material_name | string | Name or description of the material or component. | Hot Rolled Steel Sheet |
order_id | string | Unique identifier for the procurement order.unique | ORD00001 |
unit_of_measure | string | Unit of measurement for the ordered quantity (e.g., kg, pcs, liters).6 values | kg |
order_status | string | Current status of the order (e.g., pending, delivered, delayed, cancelled).pending · delivered · delayed · cancelled | delivered |
delay_reason | string | Reason for delivery delay, if applicable.optional | Customs clearance delay |
supplier_country | string | Country where the supplier is located. | Germany |
supplier_city | string | City where the supplier is located.optional | Dusseldorf |
contact_email | string | Primary contact email for the supplier.optional | info@ |
| Numbers 2 columns | |||
lead_time_days | float | Number of days between order placement and actual delivery (actual_delivery_date - order_date).0 or more · optional | 6 |
quantity_ordered | float | Quantity of material ordered in the procurement order.0 or more | 2500 |
| Dates and times 3 columns | |||
order_date | date | Date when the order was placed with the supplier. | 2023-02-16 |
expected_delivery_date | date | Date when the supplier is expected to deliver the material. | 2023-02-22 |
actual_delivery_date | date | Date when the material was actually delivered.optional | 2023-02-22 |
Use it for
A manufacturing dashboard
Lead_
time_ days by order_ status and a breakdown of unit_ of_ measure. Excel, Power BI or Tableau. Why do the 102 delivered rows have a mean lead_
time_ days of 7.9? A root-cause class exercise
Hand out the rows and one question. The answer is in the data, not in the brief.
- Suppliers200SUPP_A0016deliveredSUPP_B0027delayedSUPP_C0039delivered
A software demo
Believable suppliers with supplier_
name, material_ id and material_ name to fill a screen in front of a buyer.
blueprint · manufacturing-supplier-lead-time-data
Behind this dataset
Same schema. As many rows as you need.
These 200 rows came out of a blueprint — 16 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.
- Include supplier ID and region
- Track lead time per order
- Segment by material type
- Flag late deliveries
1 credit per row. Preview 20 rows free. Buy rows for the full run.