Supply Chain Route Disruption Scenarios

This dataset provides a comprehensive record of simulated supply chain route disruptions, including scenario definitions, event details, affected routes, and operational logs. It enables logistics professionals to analyze the impact of various disruption types, optimize routing strategies, and enhance supply chain resilience through scenario-based planning.

  • last updated 22 Jul 2025
  • by GoMask
The brief that made it

Logistics network resilience assessment and optimization

Sample rows

preview · 8 of 200 rows · all 24 columns
scenario_idstringimpact_severitystringdelay_duration_minutesintegerevent_typestringscenario_namestringevent_idstringscenario_id_refstringevent_start_datetimedatetimeevent_end_datetimedatetimeaffected_route_idstringroute_namestringorigin_locationstringdestination_locationstringroute_distance_kmfloatroute_modestringroute_statusstringlog_idstringaffected_route_id_refstringlog_datetimedatetimelog_event_typestringscenario_descriptionstringevent_descriptionstringlog_descriptionstringreroute_detailsstring
SCN001criticalblanknatural_disasterEast Coast Hurricane ImpactEVT001SCN0012023-08-21T06:00:00Z2023-08-24T18:00:00ZROUTE1001Charlotte to Norfolk Freight LinkCharlotteNorfolk535.8roadclosedLOG0001ROUTE10012023-08-22T08:12:00ZclosureA major hurricane disrupts freight traffic along the Eastern Seaboard, impacting multiple logistics hubs.Hurricane force winds cause highway closures and port delays in the Carolinas.Route closed due to major flooding and debris blocking main corridor.blank
SCN002high1560natural_disasterTranscontinental Snowstorm DisruptionEVT002SCN0022023-12-10T02:00:00Z2023-12-15T17:00:00ZROUTE1002Chicago-St Paul ExpressChicagoSt Paul634.2raildelayedLOG0002ROUTE10022023-12-12T09:00:00ZdelayAn unseasonal snowstorm halts rail and road transport across northern states.Heavy snowfall causes derailments and impassable highways.Rail services delayed due to snow accumulation and track clearing operations.blank
SCN003medium520equipment_failurePacific Port Crane MalfunctionEVT003SCN0032023-06-04T11:00:00Z2023-06-05T19:00:00ZROUTE1003Seattle to Yokohama Sea LaneSeattleYokohama7678.3seadelayedLOG0003ROUTE10032023-06-04T18:30:00ZdelayA critical crane failure at a busy seaport delays container unloading and onward shipping.Main container crane stops working, disrupting cargo handling.Sea route delayed due to port crane breakdown, awaiting repairs.blank
SCN004highblanklabor_strikeBorder Labor Strike FalloutEVT004SCN0042023-04-14T05:00:00Z2023-04-19T10:00:00ZROUTE1004Windsor to Detroit Truck RouteWindsorDetroit13.2roadclosedLOG0004ROUTE10042023-04-14T09:06:00ZclosureA labor strike at a border crossing brings truck shipments to a halt for several days.Customs staff walk out, blocking cross-border freight.Truck movements suspended due to ongoing labor action at border.blank
SCN005low55otherRoutine Track InspectionEVT005SCN0052023-05-22T10:00:00Z2023-05-22T18:00:00ZROUTE1005Birmingham to Oxford RailBirminghamOxford143.7raildelayedLOG0005ROUTE10052023-05-22T12:30:00ZdelayScheduled safety inspection temporarily slows down cargo rail service.Annual inspection causes minor delays on regional line.Routine inspection slowed freight movements, minor schedule impact.blank
SCN006lowblankotherTest Case: Simulated OutlierEVT006SCN0062023-01-15T00:00:00ZblankROUTE1006Moscow to Buenos Aires UltraMoscowBuenos Aires13923.7multimodalopenLOG0006ROUTE10062023-01-15T00:15:00ZotherSystem test scenario with ultra-long distance and artificial disruption.Simulated event to test system response; no real disruption.Test log entry for system monitoring; no operational impact.blank
SCN007high600equipment_failureWest Coast Port BacklogEVT007SCN0072023-09-08T13:00:00Z2023-09-08T19:45:00ZROUTE1007Long Beach to ShanghaiLong BeachShanghai10413.2seadelayedLOG0007ROUTE10072023-09-08T15:00:00ZdelayEquipment malfunction at a major port causes container backlog and delays.Container loader failure disrupts unloading at port.Delays at port due to equipment breakdown, backlog expected for 10 hours.blank
SCN008criticalblankpolitical_unrestCentral Europe Border ClosureEVT008SCN0082023-03-02T03:00:00ZblankROUTE1008Prague to Vienna HaulPragueVienna333.9roadclosedLOG0008ROUTE10082023-03-02T06:00:00ZclosurePolitical unrest leads to the closure of a major road border crossing.Demonstrations force authorities to close border checkpoint.Major road crossing closed due to unrest; alternate routes being considered.blank

What the 200 rows show

from the 200-row sample

High (impact severity) stands out: mean delay_duration_minutes is 833.1, against 227.9 for the rest.

  • 297.5median delay_duration_minutes
  • 4route statuses
  • 5route modes
  • 5log event types
  • 394.0median route_distance_km
Mean delay_duration_minutes by impact_severity78 rows
05001,00055.9low18 rows319.0medium34 rows833.1high26 rows
delay_duration_minutes78 rows, in bands of 200
0204034111193333101,0001,800delay_duration_minutes →

Median 297.5, from 18 to 1,800.

event_type200 rows · 6 values
  1. other106
  2. natural_disaster34
  3. equipment_failure22
  4. accident20
  5. labor_strike10
  6. political_unrest8
24 columns by typefrom the column list below
  • string 19
  • integer 1
  • float 1
  • datetime 3

Columns

24 columns in three groups
blueprint · 24 columns
columntypedescriptionexample
Text 19 columns
scenario_idstringUnique identifier for each disruption scenariouniqueSCN001
scenario_namestringDescriptive name for the disruption scenarioRoutine Track Inspection
scenario_descriptionstringDetailed description of the disruption scenariooptionalA major hurricane disrupt…
event_idstringUnique identifier for each disruption eventuniqueEVT001
scenario_id_refstringReference to the scenario_id this event belongs toSCN001
event_typestringType of disruption event (e.g., natural disaster, labor strike, accident)6 valuesnatural_disaster
event_descriptionstringDetailed description of the disruption eventoptionalHurricane force winds cau…
affected_route_idstringIdentifier for the supply chain route affected by the eventROUTE1001
route_namestringDescriptive name for the affected routeoptionalChicago-St Paul Express
origin_locationstringStarting point of the supply chain route (city or facility name)Charlotte
destination_locationstringEnd point of the supply chain route (city or facility name)Norfolk
route_modestringMode of transportation for the route (e.g., road, rail, air, sea)road · rail · air · sea · multimodalroad
route_statusstringCurrent operational status of the route (e.g., open, delayed, closed, rerouted)open · delayed · closed · reroutedclosed
log_idstringUnique identifier for each route log entryuniqueLOG0001
affected_route_id_refstringReference to the affected_route_id this log entry pertains toROUTE1001
log_event_typestringType of route log event (e.g., delay, reroute, closure, recovery)delay · reroute · closure · recovery · otherclosure
log_descriptionstringDetails about the route log eventoptionalRoute closed due to major…
reroute_detailsstringDescription of reroute path or alternative route, if applicableoptionalRerouted via Colombo and …
impact_severitystringSeverity of the disruption's impact on the route (e.g., low, medium, high, critical)low · medium · high · critical · optionalcritical
Numbers 2 columns
route_distance_kmfloatTotal distance of the route in kilometers0 or more · optional535.8
delay_duration_minutesintegerDuration of delay in minutes, if applicable0 or more · optional1560
Dates and times 3 columns
event_start_datetimedatetimeDate and time when the disruption event started2023-08-21T06:00:00Z
event_end_datetimedatetimeDate and time when the disruption event endedoptional2023-08-24T18:00:00Z
log_datetimedatetimeTimestamp for when the log entry was recorded2023-08-22T08:12:00Z

Use it for

  • median delay d…297.578 rowsmean delay duration m…55.9low319.0medium833.1high

    A logistics dashboard

    Delay_duration_minutes by impact_severity and a breakdown of event_type. Excel, Power BI or Tableau.

  • Why do the 26 high rows have a mean delay_duration_minutes of 833.1?

    A root-cause class exercise

    Hand out the rows and one question. The answer is in the data, not in the brief.

  • A software demo

    Believable scenarios with scenario_name, scenario_description and event_id to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 24 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

1,000 rows: $1.99 · 10,000: $12.99One-time. No subscription. All prices

This dataset200 rows24 columns
Yours1,000 rows24 columnsorigin_location: UK only

blueprint · supply-chain-route-disruption-scenarios

Behind this dataset

Same schema. As many rows as you need.

These 200 rows came out of a blueprint — 24 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • Define route segments with ETA and cargo details
  • Inject realistic delay and disruption events
  • Include weather, customs, and labor event triggers
  • Simulate multi-modal (road, rail, sea) shipments
Rows
Open the blueprint in Data Factory

1 credit per row. Preview 20 rows free. Buy rows for the full run.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
supply-chain-route-disruption-scenarios

What should your data show?

Preview 20 rows free
No signup. No card.