• Energy
  • 19 columns
  • 100 rows
  • 8 formats

Uranium Fuel Inventory and Nuclear Refueling Schedules

This dataset provides detailed, up-to-date information on uranium fuel inventory, enrichment levels, refueling outage schedules, and spent fuel pool storage for pressurized and boiling water nuclear reactors. It enables operational planning, regulatory compliance, and risk assessment for nuclear fuel management across multiple reactor sites.

  • last updated 2 Nov 2025
  • by GoMask
The brief that made it

Operational planning and scheduling for nuclear reactor refueling

Sample rows

preview · 8 of 100 rows · all 19 columns
reactor_idstringreactor_typestringfuel_assembly_countintegersite_countrystringreactor_namestringsite_namestringsite_street_addressstringsite_citystringsite_statestringsite_postal_codestringaverage_enrichment_percentfloatnext_refueling_start_datedatenext_refueling_end_datedatelast_refueling_start_datedatelast_refueling_end_datedatespent_fuel_pool_capacityintegerspent_fuel_pool_current_loadintegerspent_fuel_pool_utilization_percentfloatlast_updateddatetime
PWR-001PWR193USARiverbend Unit 1Riverbend Nuclear Station100 Power RdGreenvilleNC278344.782025-03-222025-04-072023-03-122023-03-29120096580.422024-06-01T14:18:22
BWR-002BWR764USAMaple Point Reactor AMaple Point Energy Center21 Maple AveSpringfieldIL627033.912024-09-142024-09-282022-10-202022-11-052200190486.552024-06-02T09:47:10
PWR-003PWR157USALakeview Unit 2Lakeview Nuclear Facility500 Energy BlvdHarrisonOH450304.122025-04-112025-04-262023-05-022023-05-1698069070.412024-05-28T17:29:33
BWR-004BWR764USAEvergreen Reactor BEvergreen Power Plant2600 Forest StBellinghamWA982253.562025-07-042025-07-172023-07-152023-07-312150188387.582024-05-31T11:04:14
PWR-005PWR193USACedar Valley Unit 1Cedar Valley Nuclear Station120 Cedar LaneMadisonWI537114.622024-11-102024-11-252022-11-162022-12-011300105280.922024-06-01T12:39:51
BWR-006BWR764USASunrise ReactorSunrise Nuclear Facility880 Sunrise RdSacramentoCA958143.842025-02-182025-03-022023-02-212023-03-072200190286.452024-05-29T08:23:02
PWR-007PWR193USAOak Ridge Unit 3Oak Ridge Energy Complex300 Ridge StKnoxvilleTN379204.892024-10-092024-10-242022-10-162022-10-301250109587.62024-06-03T15:07:41
BWR-008BWR764USAPine Run ReactorPine Run Nuclear Plant1000 Pine StAugustaGA309013.992025-06-102025-06-232023-06-182023-07-0321001890902024-06-01T18:51:32

What the 100 rows show

from the 100-row sample

PWR (reactor type) stands out: mean fuel_assembly_count is 190.2, against 744.6 for the rest.

  • 204median fuel_assembly_count
  • 4.4median average_enrichment_percent
  • 1,165median spent_fuel_pool_capacity
  • 1,023median spent_fuel_pool_current_load
  • 87.2median spent_fuel_pool_utilization_percent
Mean fuel_assembly_count by reactor_type100 rows
0400800190.2PWR54 rows744.6BWR46 rows
fuel_assembly_count100 rows, in bands of 100
025504311000541100500800fuel_assembly_count →

Median 204, from 157 to 792.

site_country100 rows · 9 values
  1. USA71
  2. Canada9
  3. Australia4
  4. Switzerland3
  5. Finland3
  6. Poland3
  7. Ireland3
  8. Spain2
  9. Mexico2
19 columns by typefrom the column list below
  • string 9
  • integer 3
  • float 2
  • date 4
  • datetime 1

Columns

19 columns in three groups
blueprint · 19 columns
columntypedescriptionexample
Text 9 columns
reactor_idstringUnique identifier for each nuclear reactoruniquePWR-001
reactor_namestringOfficial name of the nuclear reactorRiverbend Unit 1
reactor_typestringType of reactor (e.g., PWR, BWR)PWR · BWRPWR
site_namestringName of the nuclear plant siteEvergreen Power Plant
site_street_addressstringStreet address of the nuclear plant site100 Power Rd
site_citystringCity where the nuclear plant site is locatedGreenville
site_statestringState or province of the nuclear plant siteNC
site_postal_codestringPostal code of the nuclear plant site27834
site_countrystringCountry where the nuclear plant site is located9 countriesUSA
Numbers 5 columns
fuel_assembly_countintegerTotal number of uranium fuel assemblies currently on-site for this reactor0 or more193
average_enrichment_percentfloatAverage uranium enrichment level (percent U-235) of fuel assemblies on-site0 to 104.78
spent_fuel_pool_capacityintegerMaximum number of spent fuel assemblies that can be stored in the spent fuel pool0 or more1200
spent_fuel_pool_current_loadintegerCurrent number of spent fuel assemblies stored in the spent fuel pool0 or more965
spent_fuel_pool_utilization_percentfloatPercent utilization of spent fuel pool (current load / capacity * 100)0 to 10080.42
Dates and times 5 columns
next_refueling_start_datedateScheduled start date for the next refueling outageoptional2025-03-22
next_refueling_end_datedateScheduled end date for the next refueling outageoptional2025-04-07
last_refueling_start_datedateStart date of the most recent refueling outageoptional2023-03-12
last_refueling_end_datedateEnd date of the most recent refueling outageoptional2023-03-29
last_updateddatetimeTimestamp when this record was last updated2024-06-01T14:18:22

Use it for

  • median fuel as…204100 rowsmean fuel assembly co…190.2PWR744.6BWR

    An energy dashboard

    Fuel_assembly_count by reactor_type and a breakdown of site_country. Excel, Power BI or Tableau.

  • Why do the 54 PWR rows have a mean fuel_assembly_count of 190.2?

    A root-cause class exercise

    Hand out the rows and one question. The answer is in the data, not in the brief.

  • A software demo

    Believable reactors with reactor_name, reactor_type and site_name to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 19 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

1,000 rows: $1.99 · 10,000: $12.99One-time. No subscription. All prices

This dataset100 rows19 columns
Yours1,000 rows19 columnssite_name: UK only

blueprint · uranium-fuel-inventory-and-nuclear-refueling-schedules

Behind this dataset

Same schema. As many rows as you need.

These 100 rows came out of a blueprint — 19 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • Nuclear plant name and reactor type (PWR or BWR)
  • Fuel assemblies on-site and in-core vs. spent fuel pool
  • Uranium enrichment level (% U-235), typically 3-5% for commercial reactors
  • Refueling outage schedule: 18-24 month cycle typical
  • Fuel burnup (GWd/MTU - gigawatt-days per metric ton uranium)
  • Fresh fuel receipts and spent fuel discharges
  • Spent fuel pool capacity and dry cask storage
  • Nuclear fuel cost ($/MWh) amortized over fuel cycle
Rows
Open the blueprint in Data Factory

1 credit per row. Preview 20 rows free. Buy rows for the full run.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
uranium-fuel-inventory-and-nuclear-refueling-schedules

What should your data show?

Preview 20 rows free
No signup. No card.