Gas Insulated Switchgear (GIS) Inspection and SF6 Leak Detection

This dataset provides comprehensive records of gas insulated switchgear inspections, capturing SF6 leak detection, pressure monitoring, partial discharge sensor readings, compartment moisture, and contact alignment verification. It enables detailed tracking of equipment health, supports predictive maintenance, and ensures regulatory compliance for high-voltage electrical infrastructure.

  • opened 10 times
  • last updated 1 Nov 2025
  • by GoMask
The brief that made it

Predictive maintenance and failure prevention for electrical switchgear

Sample rows

preview · 8 of 400 rows · all 15 columns
inspection_idstringcontact_alignment_statusstringsf6_pressure_barfloataction_requiredbooleanswitchgear_idstringinspection_datedateinspector_namestringlocation_sitestringcompartment_idstringsf6_leak_ppmfloatpartial_discharge_acoustic_dbfloatpartial_discharge_uhf_dbfloatcompartment_moisture_ppmfloatnext_maintenance_datedateremarksstring
INSP-00001Aligned6.84falseSG-123A2023-01-14Victor PearsonDallas-NorthHubCPT-A1015.313.756.22024-01-15Routine inspection completed. No issues found.
INSP-00002Aligned7.1falseSG-124B2023-01-18Priya ShahHouston-WestSubCPT-B20.419.817.238.12023-11-18Routine inspection completed. No issues found.
INSP-00003Aligned7.35falseSG-125C2023-02-11Ethan LeeAustin-EastGridCPT-C1011.511.965.42024-02-13Routine inspection completed. No issues found.
INSP-00004Aligned6.15falseSG-126D2023-03-21Maria SanchezSanAntonio-CentralCPT-D3222.114.7110.72023-09-21Slight increase in moisture/PD. Recommend closer monitoring.
INSP-00005Aligned7.36falseSG-127E2023-04-03James HowardElPaso-Substation3CPT-E21.318.716.390.42024-04-07Routine inspection completed. No issues found.
INSP-00006Aligned6.91falseSG-128F2023-05-12Linda TranAmarillo-EastYardCPT-F10.814.612.5432024-05-13Routine inspection completed. No issues found.
INSP-00007Aligned7.5falseSG-129G2023-05-28Olga PetrovLubbock-WestFieldCPT-G4011.210.429.82024-05-28Routine inspection completed. No issues found.
INSP-00008Aligned6.5falseSG-123A2023-06-04Ravi KumarDallas-NorthHubCPT-A20.717.915.677.22024-06-04Routine inspection completed. No issues found.

What the 400 rows show

from the 400-row sample

Not Checked (contact alignment status) stands out: mean sf6_pressure_bar is 0.72, against 6.6 for the rest.

  • 7%action_required = true
  • 6.9median sf6_pressure_bar
  • 98switchgears
  • 98compartments
  • 0.50median sf6_leak_ppm
  • 16.2median partial_discharge_acoustic_db
Mean sf6_pressure_bar by contact_alignment_status400 rows
0487.0Aligned333 rows1.9Misaligned28 rows0.72Not Checked39 rows
sf6_pressure_bar400 rows, in bands of 1
090180411110305157173048sf6_pressure_bar →

Median 6.9, from 0.0 to 7.7.

15 columns by typefrom the column list below
  • string 7
  • float 5
  • date 2
  • boolean 1

Columns

15 columns in four groups
blueprint · 15 columns
columntypedescriptionexample
Text 7 columns
inspection_idstringUnique identifier for each GIS inspection recorduniqueINSP-00001
switchgear_idstringUnique identifier for the gas insulated switchgear unitSG-123A
inspector_namestringFull name of the inspector conducting the inspectionVictor Pearson
location_sitestringName or code of the site where the switchgear is locatedDallas-NorthHub
compartment_idstringIdentifier for the specific compartment within the switchgearCPT-A1
contact_alignment_statusstringStatus of contact alignment verification (e.g., 'Aligned', 'Misaligned', 'Not Checked')Aligned · Misaligned · Not CheckedAligned
remarksstringAdditional comments or observations from the inspectionoptionalRoutine inspection comple…
Numbers 5 columns
sf6_leak_ppmfloatMeasured SF6 gas leak concentration in ppm-m (parts per million-meter)0 or more0
sf6_pressure_barfloatMeasured SF6 gas pressure in bar0 or more6.84
partial_discharge_acoustic_dbfloatPartial discharge acoustic sensor reading in decibels (dB)0 or more · optional15.3
partial_discharge_uhf_dbfloatPartial discharge UHF sensor reading in decibels (dB)0 or more · optional13.7
compartment_moisture_ppmfloatMeasured moisture level in the compartment in ppm (parts per million)0 or more · optional56.2
Dates and times 2 columns
inspection_datedateDate when the inspection was conducted2023-01-14
next_maintenance_datedateScheduled date for the next maintenance or inspectionoptional2024-01-15
True or false 1 column
action_requiredbooleanIndicates if any corrective action is required based on inspection resultsfalse

Use it for

  • action required7%28 of 400 rowsmean sf6 pressure bar…7.0Aligned1.9Misali…0.72Not Ch…

    An energy dashboard

    The action_required rate and sf6_pressure_bar by contact_alignment_status. Excel, Power BI or Tableau.

  • Why do the 39 Not Checked rows have a mean sf6_pressure_bar of 0.72?

    A root-cause class exercise

    Hand out the rows and one question. The answer is in the data, not in the brief.

  • A software demo

    Believable inspections with switchgear_id, inspection_date and inspector_name to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 15 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

1,000 rows: $1.99 · 10,000: $12.99One-time. No subscription. All prices

This dataset400 rows15 columns
Yours1,000 rows15 columnslocation_site: UK only

blueprint · gas-insulated-switchgear-gis-inspection-and-sf6-leak-detection

Behind this dataset

Same schema. As many rows as you need.

These 400 rows came out of a blueprint — 15 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • GIS bay ID, manufacturer, and rated voltage (72.5kV-550kV typical)
  • SF6 gas pressure per compartment (psig) and alarm thresholds
  • Leak detection: infrared camera, sniffer probe (ppm-m sensitivity)
  • Annual leak rate: <0.5% of gas inventory per year target
  • Partial discharge monitoring: acoustic sensors, UHF antennas
  • Moisture content in SF6 gas (ppm, <150ppm typical)
  • Contact alignment and travel measurements
  • Environmental regulations: SF6 greenhouse gas emissions reporting (EPA)
Rows
Open the blueprint in Data Factory

1 credit per row. Preview 20 rows free. Buy rows for the full run.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
gas-insulated-switchgear-gis-inspection-and-sf6-leak-detection

What should your data show?

Preview 20 rows free
No signup. No card.