Green Building Materials Supply Chain

This dataset provides granular tracking of eco-friendly building material procurement, delivery timelines, supplier ESG performance, and compliance certifications for real estate projects. It enables supply chain managers and sustainability consultants to benchmark suppliers, monitor delivery delays, and ensure regulatory compliance, supporting data-driven decisions for greener construction.

  • last updated 25 Nov 2025
  • by GoMask
The brief that made it

Benchmarking supplier ESG and sustainability performance

Sample rows

preview · 8 of 65 rows · all 25 columns
material_idstringdelivery_statusstringdelivery_delay_daysintegerproject_idstringmaterial_namestringmaterial_typestringsupplier_idstringsupplier_namestringsupplier_esg_scorefloatorder_idstringorder_datedatequantity_orderedfloatunit_of_measurestringexpected_delivery_datedateactual_delivery_datedatecompliance_certificationstringcompliance_statusbooleanproject_namestringproject_location_streetstringproject_location_citystringproject_location_statestringproject_location_postal_codestringproject_location_countrystringprocurement_managerstringorder_total_costfloat
MAT-001delivered2PRJ-901Recycled Denim InsulationinsulationSUP-101EcoFiber Supplies88.2ORD-100012024-03-051200.5kg2024-03-202024-03-22LEEDtrueGreen Horizons Tower152 Main StDenverCO80203USAJenna Martinez73250
MAT-002delivered0PRJ-902Bamboo FlooringflooringSUP-102NatureBuild Inc.76.5ORD-100022024-01-17430m22024-02-012024-02-01FSCtrueUrban Eco Lofts47 Oak Ridge AveAustinTX78704USAMason Lee22300
MAT-003delivered1PRJ-903Low-VOC PaintpaintSUP-103GreenChem Paints92.1ORD-100032024-04-11320liters2024-04-202024-04-21Cradle to CradletrueSunrise Villas89 Willow LaneOrlandoFL32801USACarla Nguyen15680
MAT-004delivered0PRJ-904Reclaimed Wood PlanksflooringSUP-104SecondLife Timber81.8ORD-100042024-02-28280m22024-03-132024-03-13FSCtrueLakeside Residences321 Lakeview DrSeattleWA98109USAJordan Smith42000
MAT-005delayed3PRJ-905Hempcrete BlocksconcreteSUP-105BioBuild Materials69.4ORD-100052024-05-03650units2024-05-182024-05-21LEEDtrueRiverfront Community Center15 River RdPortlandOR97209USARafael Torres51750
MAT-006delayed2PRJ-902Cork TilesflooringSUP-102NatureBuild Inc.76.5ORD-100062024-02-13180m22024-02-282024-03-02FSCtrueUrban Eco Lofts47 Oak Ridge AveAustinTX78704USAMason Lee10350
MAT-007delivered0PRJ-906Recycled Glass TilestileSUP-106GreenGlass Ltd.84.6ORD-100072024-03-24900units2024-04-092024-04-09Cradle to CradletrueDowntown Green Office100 Market StBostonMA02108USAOlivia Chen37400
MAT-008delivered0PRJ-907Solar Roof PanelssolarSUP-107SunGen Renewables90.7ORD-100082024-04-1644units2024-05-012024-05-01LEEDtrueTechPark Innovation Hub201 Silicon BlvdSan JoseCA95110USALucas White79200

What the 65 rows show

from the 65-row sample

Delivered (delivery status) stands out: mean delivery_delay_days is 0.27, against 2.4 for the rest.

  • 1median delivery_delay_days
  • 2project location countries
  • 4compliance certifications
  • 7unit of measures
  • 80.2median supplier_esg_score
  • 420.0median quantity_ordered
Mean delivery_delay_days by delivery_status56 rows
0240.27delivered26 rows2.4delayed30 rows
delivery_delay_days56 rows, in bands of 1
01530221011742036delivery_delay_days →

Median 1, from 0 to 6.

project_id65 rows · top 10 of 32 values
  1. PRJ-9016
  2. PRJ-9026
  3. PRJ-9076
  4. PRJ-9035
  5. PRJ-9065
  6. PRJ-9085
  7. PRJ-9044
  8. PRJ-9054
  9. PRJ-8911
  10. PRJ-8921
25 columns by typefrom the column list below
  • string 17
  • integer 1
  • float 3
  • date 3
  • boolean 1

Columns

25 columns in four groups
blueprint · 25 columns
columntypedescriptionexample
Text 17 columns
material_idstringUnique identifier for each building materialuniqueMAT-001
material_namestringName of the eco-friendly building materialBamboo Flooring
material_typestringType/category of building material (e.g., insulation, flooring, concrete)insulation
supplier_idstringUnique identifier for the supplier providing the materialSUP-101
supplier_namestringName of the supplier companyEcoFiber Supplies
order_idstringUnique identifier for each procurement orderuniqueORD-10001
unit_of_measurestringUnit of measure for the material (e.g., kg, m2, liters)7 measureskg
delivery_statusstringCurrent delivery status (e.g., pending, shipped, delivered, delayed)pending · shipped · delivered · delayed · cancelleddelivered
compliance_certificationstringCertification or compliance standard met by the material (e.g., LEED, FSC, Cradle to Cradle)4 certifications · optionalLEED
project_idstringUnique identifier for the real estate projectPRJ-901
project_namestringName of the real estate projectGreen Horizons Tower
project_location_streetstringStreet address of the project siteoptional152 Main St
project_location_citystringCity where the project is locatedDenver
project_location_statestringState or province of the project locationoptionalCO
project_location_postal_codestringPostal code of the project locationoptional80203
project_location_countrystringCountry of the project location2 countriesUSA
procurement_managerstringName of the procurement manager responsible for the orderoptionalJenna Martinez
Numbers 4 columns
supplier_esg_scorefloatSupplier’s ESG (Environmental, Social, Governance) performance score (0-100)0 to 100 · optional88.2
quantity_orderedfloatQuantity of material ordered (in standard units)0 or more1200.5
delivery_delay_daysintegerNumber of days delivery was delayed (if any)0 or more · optional2
order_total_costfloatTotal cost of the material order (in project currency)0 or more · optional73250
Dates and times 3 columns
order_datedateDate when the material was ordered2024-03-05
expected_delivery_datedateExpected date for material delivery2024-03-20
actual_delivery_datedateActual date when material was deliveredoptional2024-03-22
True or false 1 column
compliance_statusbooleanIndicates if the material meets required sustainability compliance standardstrue

Use it for

  • median deliver…156 rowsmean delivery delay d…0.27delive…2.4delayed

    A real estate dashboard

    Delivery_delay_days by delivery_status and a breakdown of project_id. Excel, Power BI or Tableau.

  • Why do the 26 delivered rows have a mean delivery_delay_days of 0.27?

    A root-cause class exercise

    Hand out the rows and one question. The answer is in the data, not in the brief.

  • A software demo

    Believable materials with material_name, material_type and supplier_id to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 25 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

1,000 rows: $1.99 · 10,000: $12.99One-time. No subscription. All prices

This dataset65 rows25 columns
Yours1,000 rows25 columnsproject_location_street: UK only

blueprint · green-building-materials-supply-chain

Behind this dataset

Same schema. As many rows as you need.

These 65 rows came out of a blueprint — 25 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • Each material entry must include supplier ESG rating and certification type
  • Delivery status is updated in real-time and cannot be left blank
  • Lead time for procurement must be recorded in days
  • Projects must be tagged by intended green building standard (e.g., LEED, BREEAM)
  • Materials exceeding industry waste thresholds are flagged
Rows
Open the blueprint in Data Factory

1 credit per row. Preview 20 rows free. Buy rows for the full run.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
green-building-materials-supply-chain

What should your data show?

Preview 20 rows free
No signup. No card.