• Energy
  • 17 columns
  • 105 rows
  • 8 formats

Network Contingency Analysis Results

This dataset provides detailed results from power grid contingency analysis, covering N-1 and N-2 scenarios, post-contingency flows, voltage and thermal violations, and recommended corrective actions. It enables planners and engineers to assess grid reliability, identify vulnerabilities, and evaluate mitigation strategies for operational and planning purposes.

  • last updated 2 Nov 2025
  • by GoMask
The brief that made it

Grid reliability assessment and vulnerability analysis

Sample rows

preview · 8 of 105 rows · all 17 columns
contingency_idstringcorrective_action_typestringvoltage_violation_value_kvfloatvoltage_violationbooleanmonitored_element_typestringscenario_typestringelement_outaged_1stringelement_outaged_2stringanalysis_datetimedatetimepost_contingency_flow_mwfloatpost_contingency_voltage_kvfloatthermal_overloadbooleanthermal_overload_value_mvafloatcorrective_action_requiredbooleanmonitored_element_idstringplanning_areastringcorrective_action_detailsstring
CNG-00001blankblankfalselineN-1LN-105blank2024-06-13T10:23:00Z152.7312.5falseblankfalseLN-105Northern Metro Gridblank
CNG-00002generation redispatch8.7truetransformerN-2TR-212LN-2232024-05-29T16:15:00Z765.3220.1true34.6trueTR-212Sanford Industrial ZoneRedispatch 120 MW from South Generators to mitigate overload and restore voltage margin.
CNG-00003blankblankfalsebusN-1BS-09blank2024-06-07T09:45:00Z80.2110.3falseblankfalseBS-09Western Plains Districtblank
CNG-00004network switchingblankfalsetransformerN-2LN-118TR-2082024-04-18T15:02:00Z398.5205.9true27.1trueTR-208Central Valley RegionSwitch parallel transformer TR-204 into service to relieve overload on TR-208.
CNG-00005blankblankfalsetransformerN-1TR-310blank2024-06-12T13:54:00Z302.4388.6falseblankfalseTR-310East Bay Expansionblank
CNG-00006blankblankfalselineN-1LN-119blank2024-06-14T11:32:00Z488.8401.2falseblankfalseLN-119Silver Lake Corridorblank
CNG-00007generation redispatch19.2truebusN-2BS-22LN-1272024-02-20T08:00:00Z505.6212.7true50trueBS-22Highland Industrial LoopRedispatch generation at Bus 22 to mitigate voltage violation and relieve thermal stress.
CNG-00008blankblankfalselineN-1LN-110blank2024-06-11T07:20:00Z115.9123.3falseblankfalseLN-110Southside Networkblank

What the 105 rows show

from the 105-row sample

Load shedding (corrective action type) stands out: mean voltage_violation_value_kv is 52.1, against 2.6 for the rest.

  • 33%voltage_violation = true
  • 1.0median voltage_violation_value_kv
  • 2scenario types
  • 397.1median post_contingency_flow_mw
  • 225.4median post_contingency_voltage_kv
  • 38.2median thermal_overload_value_mva
Mean voltage_violation_value_kv by corrective_action_type35 rows
0408013.0generation r…4 rows52.1load shedding12 rows0.44network swit…19 rows
voltage_violation_value_kv35 rows, in bands of 10
01530212012903060voltage_violation_value_kv →

Median 1.0, from 0.07 to 58.7.

monitored_element_type105 rows · 3 values
  1. line39
  2. transformer38
  3. bus28
17 columns by typefrom the column list below
  • string 9
  • float 4
  • datetime 1
  • boolean 3

Columns

17 columns in four groups
blueprint · 17 columns
columntypedescriptionexample
Text 9 columns
contingency_idstringUnique identifier for each contingency scenario analyzeduniqueCNG-00001
scenario_typestringType of contingency scenario (e.g., N-1, N-2)N-1 · N-2N-1
element_outaged_1stringIdentifier of the first network element outaged in the scenarioLN-105
element_outaged_2stringIdentifier of the second network element outaged in N-2 scenarios; null for N-1optionalLN-223
corrective_action_typestringType of corrective action recommended (e.g., generation redispatch, load shedding, switching); null if not required4 values · optionalgeneration redispatch
corrective_action_detailsstringDetailed description of the recommended corrective action; null if not requiredoptionalRedispatch 120 MW from So…
monitored_element_idstringIdentifier of the network element (line, transformer, bus) being monitored for violationsLN-105
monitored_element_typestringType of monitored element (e.g., line, transformer, bus)line · transformer · busline
planning_areastringName or code of the planning area or region analyzedNorthern Metro Grid
Numbers 4 columns
post_contingency_flow_mwfloatPost-contingency power flow in megawatts (MW) for the monitored element0 or more152.7
post_contingency_voltage_kvfloatPost-contingency voltage in kilovolts (kV) at the monitored bus0 or more312.5
voltage_violation_value_kvfloatAmount of voltage violation in kilovolts (if any); null if no violationoptional8.7
thermal_overload_value_mvafloatAmount of thermal overload in MVA (if any); null if no overloadoptional34.6
Dates and times 1 column
analysis_datetimedatetimeTimestamp when the contingency analysis was performed2024-06-13T10:23:00Z
True or false 3 columns
voltage_violationbooleanIndicates if a voltage violation occurred (true/false)false
thermal_overloadbooleanIndicates if a thermal overload occurred (true/false)false
corrective_action_requiredbooleanIndicates if any corrective action is required for this contingencyfalse

Use it for

  • voltage violat…33%35 of 105 rowsmean voltage violatio…13.0genera…52.1load s…0.44networ…

    An energy dashboard

    The voltage_violation rate, voltage_violation_value_kv by corrective_action_type and a breakdown of monitored_element_type. Excel, Power BI or Tableau.

  • Why do the 12 load shedding rows have a mean voltage_violation_value_kv of 52.1?

    A root-cause class exercise

    Hand out the rows and one question. The answer is in the data, not in the brief.

  • A software demo

    Believable contingencies with scenario_type, element_outaged_1 and element_outaged_2 to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 17 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

1,000 rows: $1.99 · 10,000: $12.99One-time. No subscription. All prices

This dataset105 rows17 columns
Yours1,000 rows17 columns

blueprint · network-contingency-analysis-results

Behind this dataset

Same schema. As many rows as you need.

These 105 rows came out of a blueprint — 17 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • Contingency ID unique per scenario
  • Contingency type: single element (N-1), double element (N-2), common mode
  • Outaged element: line, transformer, generator
  • Post-contingency power flows
  • Voltage violations: buses outside limits (typically ±5%)
  • Thermal overloads: elements above emergency rating
  • Convergence status of power flow solution
  • Severity index or ranking
Rows
Open the blueprint in Data Factory

1 credit per row. New accounts start with 25 free credits.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
network-contingency-analysis-results

What should your data show?

Preview 20 rows free
No signup. No card.