Real Estate Construction Supply Risk Logs

This dataset provides detailed logs of supply chain risks affecting real estate construction projects, including information on delays, disruptions, impacted materials, suppliers, mitigation actions, and financial impacts. It enables project managers and operations teams to monitor vulnerabilities, analyze risk patterns, and improve project delivery timelines and resilience. The structured format supports proactive risk management and comprehensive reporting for large-scale construction operations.

  • last updated 4 Jan 2026
  • by GoMask
The brief that made it

Proactive identification and mitigation of supply chain risks in construction projects

Sample rows

preview · 8 of 62 rows · all 28 columns
risk_log_idstringrisk_severitystringfinancial_impact_estimatefloatlocation_citystringproject_idstringproject_namestringlocation_statestringlocation_countrystringmaterial_idstringmaterial_namestringsupplier_idstringsupplier_namestringrisk_typestringrisk_statusstringdate_identifieddateexpected_impact_start_datedateexpected_impact_end_datedateactual_impact_daysintegermitigation_statusstringmitigation_ownerstringdate_mitigateddatecreated_bystringcreated_atdatetimeupdated_bystringupdated_atdatetimerisk_descriptionstringmitigation_actionstringresidual_riskstring
RL-000001high3500San DiegoPJT-101Harbor ResidencesCAUSAMAT-001Reinforced ConcreteSUP-005WestBuild Materialsdelayidentified2024-02-152024-02-182024-02-220completedJ. Martinez2024-02-20martinez_j2024-02-15T09:48:00martinez_j2024-02-20T16:03:00Scheduled concrete delivery missed due to supplier truck breakdown.Arranged alternate delivery with backup supplier.Minor scheduling adjustments required for next phase.
RL-000002critical6100.5TorontoPJT-102Maple Grove HeightsONCanadaMAT-009Insulation PanelsSUP-007PolarTechshortagein_progress2024-01-192024-01-222024-02-108in_progressA. Smithblankasmith2024-01-19T10:01:00asmith2024-02-11T15:32:00Supply shortage due to winter storm impacting distribution.Expedited alternate orders and rescheduled insulation tasks.May affect HVAC installation timeline.
RL-000003medium2600MiamiPJT-103Emerald TowersFLUSAMAT-003Glass Facade PanelsSUP-011ClearView Glassquality_issuemitigated2024-02-032024-02-052024-02-103completedK. Lee2024-02-11klee2024-02-03T11:36:00klee2024-02-12T09:40:00Delivered facade panels failed quality inspection due to warping.Panels returned and replacements prioritized.Replacement may delay window installation by 2 days.
RL-000004critical9500AustinPJT-104Sunset GardensTXUSAMAT-005Steel BeamsSUP-003LoneStar Steelworksdisruptionidentified2024-03-042024-03-062024-03-200not_startedblankblankproject_ops2024-03-04T08:15:00blankblankWork stoppage at supplier facility due to labor strike.Investigating alternative suppliers in neighboring states.Potential cost increase if alternate supplier is engaged.
RL-000005medium1200.25San DiegoPJT-101Harbor ResidencesCAUSAMAT-008Copper WiringSUP-004Pacific Electricdelaymitigated2024-01-252024-01-282024-02-022completedT. Nguyen2024-02-03tnguyen2024-01-25T12:03:00tnguyen2024-02-04T09:15:00Late shipment of copper wiring due to customs clearance delay.Worked with customs broker to expedite shipment.Electrical rough-in may require re-sequencing.
RL-000006high4300MadisonPJT-105Lakeside VillasWIUSAMAT-007Roofing MembraneSUP-014RoofSystems Inc.quality_issuein_progress2024-02-222024-02-242024-03-100in_progressM. Bensonblankmbenson2024-02-22T13:37:00mbenson2024-02-25T10:21:00Roofing membrane batch was found to have manufacturing defects.Requested replacement batch and halted installation.Installation delay may affect interior finishing.
RL-000007medium1900DenverPJT-106Mountainview EstatesCOUSAMAT-004Structural LumberSUP-009RockyTimbershortageidentified2024-01-102024-01-132024-01-200not_startedblankblankproject_ops2024-01-10T14:09:00blankblankShortage due to supplier’s inventory mismanagement.Supplier to expedite next shipment.Risk of further delays if shipment is missed.
RL-000008high7200MiamiPJT-103Emerald TowersFLUSAMAT-010Elevator SystemsSUP-006LiftCorpdelayin_progress2024-03-012024-03-052024-03-204in_progressS. Patelblankspatel2024-03-01T10:27:00spatel2024-03-09T08:51:00Elevator system installation delayed by missing permits.Permit office contacted and expedited.Elevator commissioning may need rescheduling.

What the 62 rows show

from the 62-row sample

Critical (risk severity) stands out: mean financial_impact_estimate is 16,243, against 4,010 for the rest.

  • 4,100median financial_impact_estimate
  • 2location countries
  • 3mitigation statuses
  • 4risk statuses
  • 5risk types
  • 0median actual_impact_days
Mean financial_impact_estimate by risk_severity62 rows
010k20k350.0low2 rows2,119medium21 rows5,892high25 rows16,243critical14 rows
financial_impact_estimate62 rows, in bands of 5,000
0204035182311011025k45kfinancial_impact_estimate →

Median 4,100, from 0.0 to 42,001.

location_city62 rows · top 10 of 28 values
  1. San Diego6
  2. Austin5
  3. Boston5
  4. Toronto4
  5. Miami4
  6. Denver4
  7. Vancouver4
  8. Chicago4
  9. Portland4
  10. Madison3
28 columns by typefrom the column list below
  • string 20
  • integer 1
  • float 1
  • date 4
  • datetime 2

Columns

28 columns in three groups
blueprint · 28 columns
columntypedescriptionexample
Text 20 columns
risk_log_idstringUnique identifier for each supply risk log entryuniqueRL-000001
project_idstringUnique identifier for the real estate projectPJT-101
project_namestringName of the real estate projectHarbor Residences
location_citystringCity where the project is locatedSan Diego
location_statestringState or province where the project is locatedCA
location_countrystringCountry where the project is located2 countriesUSA
material_idstringUnique identifier for the construction materialMAT-001
material_namestringName of the critical construction materialReinforced Concrete
supplier_idstringUnique identifier for the supplieroptionalSUP-005
supplier_namestringName of the supplier providing the materialoptionalWestBuild Materials
risk_typestringType of supply chain risk (e.g., delay, disruption, shortage, quality issue)delay · disruption · shortage · quality_issue · otherdelay
risk_descriptionstringDetailed description of the supply risk eventScheduled concrete delive…
risk_severitystringSeverity level of the risk (e.g., low, medium, high, critical)low · medium · high · criticalhigh
risk_statusstringCurrent status of the risk (e.g., identified, in_progress, mitigated, closed)identified · in_progress · mitigated · closedidentified
mitigation_actionstringDescription of mitigation actions taken to address the riskoptionalBackup truck dispatched.
mitigation_statusstringStatus of mitigation actions (e.g., not_started, in_progress, completed, ineffective)not_started · in_progress · completed · ineffective · optionalcompleted
mitigation_ownerstringName or identifier of the person/team responsible for mitigationoptionalJ. Martinez
residual_riskstringDescription of any remaining risk after mitigationoptionalNo impact anticipated.
created_bystringUser or system that created the risk log entrymartinez_j
updated_bystringUser or system that last updated the risk log entryoptionalmartinez_j
Numbers 2 columns
actual_impact_daysintegerNumber of days the project was actually impacted due to this risk0 or more · optional0
financial_impact_estimatefloatEstimated financial impact of the risk (in project currency)0 or more · optional3500
Dates and times 6 columns
date_identifieddateDate when the risk was first identified2024-02-15
expected_impact_start_datedateDate when the risk is expected to start impacting the projectoptional2024-02-18
expected_impact_end_datedateDate when the risk is expected to stop impacting the projectoptional2024-02-22
date_mitigateddateDate when the risk was mitigated or closedoptional2024-02-20
created_atdatetimeTimestamp when the risk log entry was created2024-02-15T09:48:00
updated_atdatetimeTimestamp when the risk log entry was last updatedoptional2024-02-20T16:03:00

Use it for

  • median financi…4,10062 rowsmean financial impact…350.0low2.1kmedi…5.9khigh16.2kcrit…

    A real estate dashboard

    Financial_impact_estimate by risk_severity and a breakdown of location_city. Excel, Power BI or Tableau.

  • Why do the 14 critical rows have a mean financial_impact_estimate of 16,243?

    A root-cause class exercise

    Hand out the rows and one question. The answer is in the data, not in the brief.

  • A software demo

    Believable risk logs with project_id, project_name and location_city to fill a screen in front of a buyer.

Not quite right?

Make it yours.

Same 28 columns, your size and your rules. See 20 rows before you pay.

Preview 20 rows free

1,000 rows: $1.99 · 10,000: $12.99One-time. No subscription. All prices

This dataset62 rows28 columns
Yours1,000 rows28 columnslocation_city: UK only

blueprint · real-estate-construction-supply-risk-logs

Behind this dataset

Same schema. As many rows as you need.

These 62 rows came out of a blueprint — 28 columns with generation rules behind each one. Open it in Data Factory to retune a column, add your own, wire in foreign keys, and run it at the size you actually need.

Rules it was built with
  • Every row represents a material supply event or risk occurrence for a specific project phase.
  • Include supplier type, material category, risk type, event date, detected delay duration, and resolution status.
  • Capture both realized incidents (e.g., shipment delays) and near-misses flagged by risk monitoring.
  • Link each risk event to a quantified impact score (e.g., days delayed, cost overrun estimate).
  • Log all mitigation actions (e.g., alternate sourcing) and their effectiveness.
Rows
Open the blueprint in Data Factory

1 credit per row. Preview 20 rows free. Buy rows for the full run.

Exports
CSV, JSON, JSONL, Parquet, SQL, Excel, TSV, XML
Licence
yours to use, including commercially
API slug
real-estate-construction-supply-risk-logs

What should your data show?

Preview 20 rows free
No signup. No card.